Land Clearing Contractors in South Carolina

Find land clearing contractors serving South Carolina properties for brush clearing, lot clearing, tree and stump removal, forestry mulching and full site clearing. We list 54 land clearing contractors across 3 South Carolina metros, each confirmed on the company’s own website (checked October 2026). Choose a city to compare them.

Browse South Carolina Land Clearing Contractors by City

South Carolina Land Clearing Contractors at a Glance

CityContractorsAlso forestry mulchingAlso stump grinding
Charleston1466
Columbia1646
Greenville2475
Total listings541717

Counts come from the listings on each city page. The Contractors column is the number of land clearing companies listed; each confirms land clearing on its own website. The other columns count companies whose sites also confirm that service, so one company can appear in more than one column.

How Much Do Land Clearing Contractors Charge in South Carolina?

Angi reports an average land clearing project cost of $3,780 in 2026, and HomeGuide estimates $1,200 to $8,000 per acre. These measure different things: one is per project, the other per acre. Stump removal, debris haul-off and grading are often priced separately. No published source gives a reliable South Carolina-specific average, so use these as national planning figures and get local quotes. See land clearing cost per acre for prices by vegetation, lot size and method.

South Carolina Rules That Affect Your Project

RuleWhat it requiresSource
Call 811 before diggingState law requires a locate request to SC811 before any excavation begins. For a normal request, operators have three full working days to mark their lines (working days exclude the day you submit, weekends and holidays); you may dig the next working day once Positive Response shows all locates are complete. A normal ticket is valid for 15 working days. Underwater excavation needs at least 10 working days’ notice and large projects at least 30 days. Private lines are the owner’s responsibility to have marked. SC811 reports that a new state law (HB 3571) took effect May 22, 2026.Source
Construction stormwater permitThe SC Department of Environmental Services (SCDES), under EPA delegation, issues coverage under the NPDES Construction General Permit SCR100000. Coverage is required for projects that disturb more than one acre, or that are part of a larger common plan that disturbs one acre or more. Sites within one-half mile of a coastal receiving water body must also apply. The re-issued permit takes effect March 30, 2026 and expires March 30, 2031.Source
Burning cleared brushSCDES Regulation 61-62.2 prohibits open burning except as listed. Burning land-clearing debris (outside predominantly residential areas) is allowed only if: the burn is at least 1,000 feet from public roadways and far enough from neighboring homes and businesses; the wind blows smoke away from roads and occupied sites; only plant material generated on site is burned, with salvageable timber and pulpwood removed first; burning starts between 9 a.m. and 3 p.m. with no material added between 3 p.m. and 9 a.m.; and no more than two 30-by-30-foot piles burn within a six-acre area at once. Local ordinances still apply. Separately, S.C. Code 48-35-10 requires notifying the State Forester before outdoor burning of woods, brush or debris; that chapter does not apply inside town or city limits (48-35-30) and bars burning during a declared forest fire emergency (scstatehouse.gov/code/t48c035.php).Source

Local rules vary by city:

  • Charleston: Grand Trees (24 inches or more DBH, excluding pines and sweet gums) are protected in the City of Charleston, and land disturbance, fill or vehicles are not allowed inside a fenced protective zone around them during construction.
  • Columbia: In Columbia, any grading or land disturbance of 5,000 square feet or more needs a City land disturbance permit before work starts, unless it is an exempt activity such as a single-family home not built as part of a subdivision.
  • Greenville: In Greenville, clearing that removes canopy trees 6 inches DBH or larger during permitted development must be offset by replacement or fee-in-lieu, and land substantially cleared for forestry is barred from development applications for 36 months.

How to Choose a Contractor in South Carolina

Walk the property with each bidder or send the same marked site plan. Ask what happens to stumps and roots, whether debris is hauled, burned or mulched, who checks tree, grading and stormwater permits, and what condition the site will be in when the crew leaves. Compare written quotes for the same scope, not headline prices.

For background, read the land clearing guide, land clearing cost per acre and land clearing permits.

Sources

Reviewed October 16, 2026. Confirm permit requirements for your parcel with the city or county.