LandClearingGuide

Excavation Cost in 2026: Per Cubic Yard, Hour & Project

Excavation typically costs $2.50–$15 per cubic yard for ordinary soil or $100–$300 per hour for excavation equipment with an operator, according to HomeGuide’s 2026 excavation cost guide. The average excavation project costs approximately $1,100–$5,600, although large foundations, basements and difficult ground conditions can cost considerably more.

Find excavation contractors

1,976 contractors across 72 metros

Reviewed

Excavation prices depend on the amount of material removed, soil conditions, digging depth, equipment requirements and whether the excavated material must be transported away.

Rock excavation is significantly more expensive than ordinary soil excavation, with published prices reaching $50–$200 or more per cubic yard when rock-breaking equipment is required.

Understanding how excavation contractors calculate prices makes it easier to estimate your project’s cost and compare quotes.

How Much Does Excavation Cost?

Excavation contractors generally charge by the cubic yard, equipment operating hour or total project.

The following table compares published national excavation costs for common residential and construction projects.

Excavation ServiceAverage Published CostPricing Unit
Light soil excavation$2.50–$6Per cubic yard
Average soil excavation$6–$10Per cubic yard
Heavy or wet soil excavation$10–$15Per cubic yard
Rock excavation requiring breaking$50–$200+Per cubic yard
Excavator with operator$100–$300Per hour
Equipment operator only$50–$150Per hour
Excavation project$1,100–$5,600Total project
Home site excavation$1,500–$10,000Total project
New basement excavation$10,000–$30,000Total project
Swimming pool excavation$1,500–$5,000Total project
Pond excavation$300–$3,200Total project
Trenching$5–$12Per linear foot

Source: HomeGuide, How Much Does Excavation Cost?, published February 5, 2026. Figures are national planning estimates. Included services and conditions vary by project.

What Is the Average Excavation Cost?

HomeGuide reports a national average excavation project cost of approximately $3,500, with a typical range of $1,100–$5,600.

This represents a range of project sizes rather than a fixed cost for a particular amount of earthmoving.

A small residential excavation may require only a few hours of equipment time, while excavating a basement or preparing a large construction site can require several days of work.

Why Do Excavation Prices Vary So Much?

Two excavation projects involving the same amount of material can have substantially different prices.

Major factors include:

  • Soil type: Loose soil is generally easier to excavate than heavy clay, hardpan or rock.
  • Excavation depth: Deeper excavation may require additional safety measures and equipment.
  • Site accessibility: Restricted access can require smaller machines and increase operating time.
  • Material disposal: Hauling excavated soil away adds transport and disposal expenses.
  • Groundwater: Water entering the excavation can require pumping or dewatering.
  • Equipment: Different projects need different machines, attachments and operators.
  • Final requirements: Precision excavation, backfilling and compaction may be additional work.

The best estimate is based on the actual volume and type of material, site conditions and required finished result.

Excavation Cost Per Cubic Yard

Excavating ordinary soil generally costs $2.50–$15 per cubic yard, according to HomeGuide. The price increases when the ground contains rock, large boulders or material requiring specialized excavation equipment.

One cubic yard equals 27 cubic feet.

Contractors may measure excavation according to the volume of material in the ground before removal, rather than the volume it occupies after digging.

Excavation Prices by Soil Type

Soil TypePublished Excavation Cost Per Cubic Yard
Light or loose soil$2.50–$6
Average soil$6–$10
Heavy or wet soil$10–$15
Rock requiring jackhammering or breaking$50–$200+

Source: HomeGuide’s excavation pricing research, February 2026. These excavation rates include labor and equipment in the source’s stated scope; hauling and additional work may be separate.

How Much Does It Cost to Excavate 100 Cubic Yards?

Using HomeGuide’s published $2.50–$15 per-cubic-yard range, excavating 100 cubic yards of ordinary soil produces a basic calculation of $250–$1,500.

Excavation VolumeCost at $2.50/YardCost at $15/Yard
25 cubic yards$62.50$375
50 cubic yards$125$750
100 cubic yards$250$1,500
250 cubic yards$625$3,750
500 cubic yards$1,250$7,500

These figures are calculations based on published unit rates, not independently observed project quotes. Minimum charges, equipment mobilization, spoil handling, shoring, rock removal and finishing work can significantly increase actual costs.

A contractor may charge a minimum project fee even when the calculated excavation volume is relatively small.

HomeGuide reports minimum excavation project charges of approximately $500–$800.

Bank Cubic Yards vs Loose Cubic Yards

Excavation measurements can refer to different material volumes.

Bank cubic yards (BCY) measure soil in its original, undisturbed condition.

Loose cubic yards (LCY) measure excavated material after it has been loosened.

Compacted cubic yards (CCY) measure material after placement and compaction.

These volumes aren’t interchangeable.

Excavated soil generally occupies more space after it is loosened, while compaction reduces the volume of placed material.

The exact change depends on soil composition and moisture.

When comparing excavation quotes, confirm which measurement the contractor is using.

Excavator Hourly Rates

Hiring an excavator with an operator typically costs $100–$300 per hour, according to HomeGuide’s 2026 pricing estimates.

Hourly rates vary by equipment size, location, operator requirements and the difficulty of the work.

Excavation Equipment or LaborPublished Cost
Excavator with operator$100–$300 per hour
Equipment operator without machine$50–$150 per hour
Excavator rental without operator$200–$700 per day

Source: HomeGuide, February 2026. Rates vary by equipment and project.

What Does an Excavator Cost for Eight Hours?

At HomeGuide’s published hourly rate of $100–$300, eight hours of excavation equipment and operator time would calculate to approximately $800–$2,400.

This is a basic hourly calculation rather than a guaranteed daily quote.

Equipment transportation, fuel arrangements, minimum charges and other services may affect the actual price.

Is Hourly Excavation Cheaper Than Per-Cubic-Yard Pricing?

Hourly excavation can be suitable when the work is difficult to measure accurately in advance.

Examples include removing isolated stumps, working around obstacles or excavating irregular areas.

Per-cubic-yard pricing is often easier to compare when the excavation volume is clearly defined.

A fixed project price can provide greater budget certainty when contractors understand the soil conditions, access and required finish.

The cheapest pricing structure depends on the project, not simply the advertised rate.

Excavation Costs by Project Type

Excavation costs vary considerably between foundations, basements, ponds, pools, driveways and utility trenches.

Each project has different depth, accuracy, access and material-handling requirements.

Project TypePublished Excavation Cost
Home site or foundation pad$1,500–$10,000
New basement excavation$10,000–$30,000
Excavation around an existing foundation$5,000–$15,000
Swimming pool excavation$1,500–$5,000
Driveway or patio excavation$1,000–$2,500
Yard excavation$500–$5,000
Hillside excavation$1,000–$5,000
Pond excavation$300–$3,200
Trenching$5–$12 per linear foot

Source: HomeGuide, February 2026. Prices describe different project scopes and should not be treated as interchangeable.

Foundation Excavation Cost

Foundation and home site excavation typically costs $1,500–$10,000, depending on the foundation size, excavation depth, soil conditions and accessibility.

Foundation excavation creates the space and elevations required for the planned foundation.

The work may include removing soil, establishing the required depth and preparing the excavation for the next construction stage.

However, excavation does not necessarily include constructing the foundation itself.

Rock, buried obstructions and difficult access can substantially increase the cost.

Basement Excavation Cost

Excavating a new basement typically costs $10,000–$30,000, according to HomeGuide.

Basement excavation generally involves removing considerably more material than a shallow foundation pad.

Costs depend on basement dimensions, excavation depth, soil conditions, groundwater and whether specialized support is required.

Excavating beneath an existing house is a different and potentially more complicated project.

HomeGuide reports excavation beneath an existing home can reach $20,000–$45,000 or more.

Swimming Pool Excavation Cost

Swimming pool excavation typically costs $1,500–$5,000 under ordinary conditions, based on HomeGuide’s estimates.

Projects involving rock, steep terrain, difficult equipment access or extensive material removal can cost significantly more.

Pool excavation prices generally do not include the completed swimming pool, shell, plumbing or finishing materials.

Pond Excavation Cost

Pond excavation generally costs $300–$3,200 for smaller projects, according to HomeGuide.

The total depends on pond size, depth, soil conditions and whether excavated material remains on the property.

Larger ponds require more substantial earthmoving.

Pond design, liners, drainage structures, spillways and other improvements may be priced separately.

Trenching Cost Per Foot

HomeGuide publishes trenching costs of approximately $5–$12 per linear foot for certain projects.

Trenching is used for underground utilities, drainage pipes, irrigation and other services.

The actual cost depends on trench depth, width, soil conditions, accessibility and required safety measures.

Deep trenches and excavations requiring protective systems can cost substantially more than shallow utility trenches.

Driveway and Patio Excavation Cost

Excavating a driveway or patio typically costs $1,000–$2,500, according to HomeGuide.

This work may involve removing existing material, excavating to the required depth and preparing the ground for the planned surface.

Some contractors include grading and compaction, while others price those services separately.

Confirm the finished elevation, drainage and compaction requirements before comparing quotes.

How Do You Calculate Excavation Volume?

Excavation volume is calculated by multiplying the excavation area’s length, width and average depth, then converting cubic feet into cubic yards.

For a simple rectangular excavation:

Cubic yards = Length (ft) × Width (ft) × Depth (ft) ÷ 27

Excavation Calculation Example

Suppose a project requires excavating:

  • Length: 30 feet.
  • Width: 20 feet.
  • Average depth: 2 feet.

The calculation is:

30 × 20 × 2 = 1,200 cubic feet

Divide by 27:

1,200 ÷ 27 = 44.44 cubic yards

The project therefore involves approximately 44.4 bank cubic yards of excavation, assuming the dimensions describe the material in its original condition.

Using HomeGuide’s ordinary-soil rates of $2.50–$15 per cubic yard gives a basic unit-rate calculation of approximately $111–$667.

That does not establish the contractor’s final price.

Mobilization, minimum charges, spoil disposal, access and other work must still be considered.

Why Excavation Volume Estimates Can Be Wrong

Simple length × width × depth calculations work best for rectangular excavations with consistent depths.

Real projects may involve:

  • Sloping excavation sides.
  • Irregular ground elevations.
  • Uneven excavation depths.
  • Over-excavation for working room.
  • Soil swell after excavation.
  • Compaction during backfilling.
  • Material unsuitable for reuse.

Larger or more complex projects may require surveyed quantities or engineering calculations.

What Affects Excavation Costs?

Several factors influence how quickly material can be excavated and what additional equipment or services are required.

Soil Conditions and Rock

Loose soil is generally easier to excavate than heavy clay, hardpan or solid rock.

Rock may require hydraulic breakers, jackhammers or other specialized equipment.

HomeGuide reports ordinary soil excavation rates of $2.50–$15 per cubic yard, compared with $50–$200 or more for rock requiring breaking.

Unexpected rock can significantly increase a project’s final cost.

Excavation Depth

Deeper excavation can require additional time, equipment and safety precautions.

Deep trenches may also need protective systems to reduce the risk of cave-ins.

The Occupational Safety and Health Administration identifies trench collapses as a major excavation hazard and provides requirements for protective systems, competent-person inspections and safe access.

Excavation depth should be considered alongside soil conditions, groundwater and nearby structures.

Equipment Access

Restricted access can prevent larger excavation machinery from entering the property.

Smaller equipment may be required, potentially increasing operating time.

Steep entrances, narrow driveways, weak bridges and nearby buildings can also complicate the work.

Excavated Soil Removal

Excavated soil is commonly called spoil.

Depending on the project, spoil may be:

  • Reused as fill elsewhere on the property.
  • Stockpiled for later use.
  • Transported to another site.
  • Hauled away for disposal.

Hauling material off-site adds transportation, handling and potentially disposal expenses.

Do not assume soil removal is included in an excavation quote.

Groundwater and Dewatering

Groundwater or accumulated surface water can interfere with excavation.

Some projects require pumps or other dewatering measures to keep the excavation workable.

Additional drainage planning may also be necessary.

Backfilling and Compaction

Excavation removes material, while backfilling places material into an excavated area.

Compaction improves the density of suitable fill according to the project’s requirements.

These services may be included in some excavation contracts and excluded from others.

For construction work, confirm whether the quote includes imported fill, compaction testing and final grade requirements.

Permits and Environmental Requirements

Some excavation projects require local development permits, grading approval, utility permits or construction stormwater authorization.

Under the federal construction stormwater framework, qualifying construction projects disturbing one acre or more generally require permit coverage.

Smaller projects may also require coverage when part of a larger common plan of development.

See the EPA’s construction stormwater guidance.

Local requirements can apply even when federal stormwater coverage is unnecessary.

Excavation vs Land Grading: What’s the Difference?

Excavation involves digging, removing or relocating earth, while land grading shapes the ground to achieve the required elevations and drainage.

The two services frequently overlap but have different purposes.

ServiceMain PurposeCommon Examples
ExcavationRemove or relocate soil and other materialFoundations, basements, trenches and ponds
Land gradingShape the ground and establish slopesBuilding pads, drainage and surface leveling
BackfillingReplace material around excavated structuresFoundations and utility trenches
CompactionIncrease the density of placed materialEngineered fill and construction preparation
Land clearingRemove vegetation and potentially stumpsWooded lots, overgrown properties and construction sites

Some contractors offer all these services.

Others specialize in excavation and work alongside grading or land-clearing contractors.

Read our land grading guide for more information about grading methods and costs.

If the property is still covered in trees or brush, see our land clearing cost guide to understand the additional work that may be needed.

What Should an Excavation Quote Include?

An excavation quote should identify the work area, excavation depth, material quantities, soil assumptions and required finished condition.

Before hiring a contractor, confirm the following details.

Quote ItemWhat to Confirm
Excavation areaLength, width, depth and location
Material quantitiesEstimated cubic yards and measurement method
Soil conditionsAssumptions about soil, clay, rock and buried obstacles
EquipmentMachines and attachments included
MobilizationEquipment transportation and minimum charges
Spoil handlingWhether soil stays on-site or is hauled away
Rock excavationAdditional charges if rock is encountered
GroundwaterResponsibility for pumping or dewatering
BackfillingWhether excavated areas will be refilled
CompactionRequired standards and whether testing is included
GradingRequired finished elevations and tolerances
PermitsResponsibility for obtaining approvals
UtilitiesUtility locating and protection
SafetyApplicable excavation protection and site controls
ScheduleStart date, expected duration and completion conditions

Why Written Excavation Scope Matters

Consider two contractors quoting for the same foundation excavation.

The first contractor may include digging only, leaving excavated soil stockpiled on the property.

The second may include excavation, soil hauling, backfilling and compaction.

Even though both quotes describe the work as excavation, the finished results are different.

Compare the complete scope, not just the hourly or per-cubic-yard rate.

How to Find an Excavation Contractor Near You

Excavation contractors work on foundations, grading, trenching, drainage, ponds, site preparation and other earthmoving projects.

The right contractor depends on the type of excavation required, equipment access and the project’s technical requirements.

Before hiring, ask about similar completed projects, equipment, insurance, site conditions and the work included in the quote.

Find Local Excavation Contractors

Browse our national excavation contractor directory to find companies serving your area.

You can explore available contractor information, review advertised services and contact local businesses directly about your project.

Find Excavation Contractors Near You →

Choose your state and city to browse relevant excavation companies.

Frequently Asked Questions About Excavation Costs

How Much Does Excavation Cost Per Cubic Yard?

Excavation typically costs $2.50–$15 per cubic yard for ordinary soil, according to HomeGuide’s February 2026 cost guide. Light soil is generally less expensive to excavate than heavy clay or rocky ground. Rock requiring jackhammering or breaking can cost $50–$200 or more per cubic yard.

How Much Does an Excavator Cost Per Hour?

HomeGuide reports excavator and operator rates of approximately $100–$300 per hour. Hiring an equipment operator without machinery typically costs $50–$150 per hour. Equipment transport, minimum operating periods and other charges may affect the final cost.

How Much Does Excavation Cost for a House Foundation?

HomeGuide reports home site or foundation-pad excavation costs of approximately $1,500–$10,000. The final price depends on foundation dimensions, digging depth, soil conditions, accessibility and whether spoil removal, grading or compaction is included.

How Much Does Basement Excavation Cost?

New basement excavation typically costs $10,000–$30,000, according to HomeGuide. Excavating beneath an existing house can be more expensive because of restricted access and the need to protect the existing structure. Rock, groundwater and deeper excavations can also increase costs.

How Much Does It Cost to Dig a Pond?

HomeGuide estimates that smaller pond excavation projects generally cost $300–$3,200 for excavation alone. Larger ponds, difficult ground conditions and material-hauling requirements can increase the price. Pond liners, spillways, design and other improvements are usually separate considerations.

How Much Does Trenching Cost Per Foot?

HomeGuide publishes trenching estimates of approximately $5–$12 per linear foot for certain projects. Trench depth, width, soil conditions and utility crossings can affect the actual rate. Deep trenches requiring protective systems and specialized excavation may cost substantially more.

Does Excavation Include Hauling Dirt Away?

Not necessarily. Some excavation contractors include spoil hauling and disposal, while others leave excavated material on-site. Ask whether transportation, disposal fees and imported replacement fill are included in the written quote.

How Many Cubic Feet Are in a Cubic Yard?

One cubic yard contains 27 cubic feet. Cubic yards measure volume, not weight. The weight of excavated material depends on soil type, moisture content and compaction. Contractors may also distinguish between bank cubic yards and loose cubic yards.

Is Excavation the Same as Grading?

No. Excavation removes or relocates earth, while grading reshapes the ground to establish elevations and drainage. Contractors sometimes perform both services, but grading, compaction and backfilling should be explicitly included in the project scope.

Can Excavation Be Done in Winter?

Yes, excavation can be performed in winter when soil conditions, equipment access and safety requirements permit it. Frozen ground, snow and groundwater conditions can complicate excavation in colder regions. Scheduling depends on local weather, soil conditions and project requirements.

Do You Need a Permit for Excavation?

Some excavation projects require local building, grading, utility or development permits. Construction-related soil disturbance may also trigger stormwater authorization requirements. Check with the responsible local and state authorities before beginning work.

Sources and Pricing References

The following sources provide the published excavation estimates and regulatory guidance referenced throughout this article.

SourceReferenceInformation Used
HomeGuideHow Much Does Excavation Cost?National excavation costs, cubic-yard pricing, hourly rates and project estimates
OSHATrenching and ExcavationExcavation hazards and workplace safety requirements
US Environmental Protection AgencyStormwater Discharges from Construction ActivitiesFederal construction stormwater permitting requirements

Last reviewed: October 16, 2026

Excavation prices are attributed third-party estimates, not quotes collected directly from LandClearingGuide contractors. Actual excavation costs vary by location, soil conditions, project size, equipment requirements and included services.